Header Repository Gunadarma

Repository Universitas Gunadarma >
E-Book >
E-Book Teknologi Industri >

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/3088

Title: Evaluation Of Cpm/Pert And Eva Analysis In Project Management
Authors: Wahyujati, Ajie
Hardian, Mohammad Okki
Keywords: contractors
CPM/PERT
EVA
Issue Date: 25-Oct-2008
Publisher: Universitas Gunadarma
Series/Report no.: Proceeding, International Seminar on Industrial Engineering and Management;1
Abstract: This research is purposed to evaluate the usage of CPM / PERT (Critical Path Method / Program Evaluation and Review Technique) and EVA (Earned Value Analysis) in a construction project, by comparing the result of those two analysis to evaluate the relationships of those methods. Research results shows that CPM/PERT and EVA have different result, technology intensive tasks has higher value on CPM/PERT, on the other hand, labor-intensive tasks has higher value on EVA. This difference will make different project report to the project owner that will make the project owner confused and give an opportunity for project contractors to make a fraudulent report.
URI: http://hdl.handle.net/123456789/3088
ISSN: 1978-774X
Appears in Collections:E-Book Teknologi Industri

Files in This Item:

File Description SizeFormat
UG_Evaluation of Cpm Pert And Eva Analysis in Project Management.pdf323.78 kBAdobe PDFView/Open

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! Repository Software Copyright © 2002-2010  Duraspace - Feedback